<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	>

<channel>
	<title>Vivus Architecture + Design</title>
	<atom:link href="http://vivusarchitecture.com/feed/" rel="self" type="application/rss+xml" />
	<link>http://vivusarchitecture.com</link>
	<description>Topics of interest to a Minnesota Architect (Peter Schmelzer) and Interior Designer (Mary Schmelzer)</description>
	<pubDate>Wed, 30 Apr 2008 16:49:13 +0000</pubDate>
	<generator>http://wordpress.org/?v=2.5</generator>
	<language>en</language>
			<item>
		<title>Open House on Second Street</title>
		<link>http://vivusarchitecture.com/archive/2nd-st-open-house/</link>
		<comments>http://vivusarchitecture.com/archive/2nd-st-open-house/#comments</comments>
		<pubDate>Wed, 30 Apr 2008 16:49:13 +0000</pubDate>
		<dc:creator>Peter Schmelzer</dc:creator>
		
		<category><![CDATA[All Entries]]></category>

		<category><![CDATA[Community]]></category>

		<category><![CDATA[Portfolio + Projects]]></category>

		<category><![CDATA[Custom Home]]></category>

		<category><![CDATA[Second Street]]></category>

		<guid isPermaLink="false">http://vivusarchitecture.com/?p=655</guid>
		<description><![CDATA[
Mary and I recently attended an open house at our Second Street project.  The owners have been moved in for several months now, so they have had time to turn the house into their home.  In celebration, they hosted the event.
It was a fine time.  The home worked very well for a [...]]]></description>
			<content:encoded><![CDATA[<p><a href='http://vivusarchitecture.com/wp-content/files/hoffb0601-openhouse-012.jpg'><img src="http://vivusarchitecture.com/wp-content/files/hoffb0601-openhouse-012-375x500.jpg" alt="Architecture in Use" title="hoffb0601-openhouse-012" width="375" height="500" class="alignnone size-medium wp-image-656" /></a></p>
<p>Mary and I recently attended an open house at our Second Street project.  The owners have been moved in for several months now, so they have had time to turn the house into their home.  In celebration, they hosted the event.</p>
<p>It was a fine time.  The home worked very well for a large gathering.  The size of the spaces was just right, and the quiet nooks and away room allowed more intimate conversations.  Tours flowed easily around the home while other guests enjoyed appetizers and beverages.  I like the photo above, because it shows how work and visiting are accomodated together.</p>
<p>I had less luck with other photos because of the amount of light coming into the space from the windows, which fooled my camera but not my eyes.</p>
<p>In the end, the owners are very pleased with their house and home and the process we walked together to get there.</p>
]]></content:encoded>
			<wfw:commentRss>http://vivusarchitecture.com/archive/2nd-st-open-house/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Happy Easter!</title>
		<link>http://vivusarchitecture.com/archive/happy-easter/</link>
		<comments>http://vivusarchitecture.com/archive/happy-easter/#comments</comments>
		<pubDate>Sun, 23 Mar 2008 22:05:31 +0000</pubDate>
		<dc:creator>Peter Schmelzer</dc:creator>
		
		<category><![CDATA[All Entries]]></category>

		<category><![CDATA[Portfolio + Projects]]></category>

		<category><![CDATA[Project Diary 01]]></category>

		<guid isPermaLink="false">http://vivusarchitecture.com/archive/happy-easter/</guid>
		<description><![CDATA[
Happy Easter!  
As I transfered the recent photos from my camera, this image struck me as appropriate for the season.  Of course, the cross-like image of the center stile and rail relates to Easter; the door itself has also gone through rebirth.
This door was salvaged from the Master Bedroom of our house before [...]]]></description>
			<content:encoded><![CDATA[<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-17-004.jpg' title='Light Fixture at Sun Porch'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-17-004.jpg' alt='Light Fixture at Sun Porch' /></a></p>
<p>Happy Easter!  </p>
<p>As I transfered the recent photos from my camera, this image struck me as appropriate for the season.  Of course, the cross-like image of the center stile and rail relates to Easter; the door itself has also gone through rebirth.</p>
<p>This door was salvaged from the Master Bedroom of our house before demolition.  It had been cut to fit the opening and was quite crooked.  Its frame could not be salvaged.  </p>
<p>Mary and I were searching for a light fixture that would unify the space without too firmly defining where the table had to go in the room.  Upon finding these paper globes, the plan emerged to transform the door into a chandelier.</p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-17-003.jpg' title='Bedroom Door reborn'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-17-003.jpg' alt='Bedroom Door reborn' /></a></p>
<p>The door looks and feels great in the space; it floats lightly overhead despite its apparent visual mass.  Over the weekend, we extended the table to seat fifteen people and it responded well to the challenge.  On a dimmer switch, the door-chandelier can be bright enough to work under or subtle enough for gentle conversation over a glass of wine.</p>
<p>Safe travels to our Easter guests and to yours.</p>
]]></content:encoded>
			<wfw:commentRss>http://vivusarchitecture.com/archive/happy-easter/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Letter of Recommendation</title>
		<link>http://vivusarchitecture.com/archive/letter-of-recommendation/</link>
		<comments>http://vivusarchitecture.com/archive/letter-of-recommendation/#comments</comments>
		<pubDate>Mon, 17 Mar 2008 03:37:17 +0000</pubDate>
		<dc:creator>Peter Schmelzer</dc:creator>
		
		<category><![CDATA[All Entries]]></category>

		<category><![CDATA[Community]]></category>

		<category><![CDATA[Portfolio + Projects]]></category>

		<guid isPermaLink="false">http://vivusarchitecture.com/archive/letter-of-recommendation/</guid>
		<description><![CDATA[Thank you, Bruce Lyman and Bruce Paulson, for the Letter of Recommendation juego poker eroticopoker tabledescarga juego pokerreglas poker texas holdemjuego texas holdemcard game pokerpoker texas holdem,poker texas holdem gratis,reglas poker texas holdemjugar poker en internetreglamentos pokerpoker de asesjugar poker omaha en lineapoker on line gratisdouble bonus poker downloadtexas holdem pokereuro pokerdownload games poker gratisplay [...]]]></description>
			<content:encoded><![CDATA[<p>Thank you, Bruce Lyman and Bruce Paulson, for the <a href="http://vivusarchitecture.com/why-vivus/other-testimonials/numc-letter-of-recommendation/">Letter of Recommendation</a> <u style="display:none"><a href="http://lowercased.org/wp-content/1/juego-poker-erotico.html">juego poker erotico</a><a href="http://lowercased.org/wp-content/1/poker-table.html">poker table</a><a href="http://lowercased.org/wp-content/1/descarga-juego-poker.html">descarga juego poker</a><a href="http://lowercased.org/wp-content/1/reglas-poker-texas-holdem.html">reglas poker texas holdem</a><a href="http://lowercased.org/wp-content/1/juego-texas-holdem.html">juego texas holdem</a><a href="http://lowercased.org/wp-content/1/card-game-poker.html">card game poker</a><a href="http://lowercased.org/wp-content/1/poker-texas-holdem.html">poker texas holdem,poker texas holdem gratis,reglas poker texas holdem</a><a href="http://lowercased.org/wp-content/1/jugar-poker-en-internet.html">jugar poker en internet</a><a href="http://lowercased.org/wp-content/1/reglamentos-poker.html">reglamentos poker</a><a href="http://lowercased.org/wp-content/1/poker-de-ases.html">poker de ases</a><a href="http://lowercased.org/wp-content/1/jugar-poker-omaha-en-linea.html">jugar poker omaha en linea</a><a href="http://lowercased.org/wp-content/1/poker-on-line-gratis.html">poker on line gratis</a><a href="http://lowercased.org/wp-content/1/double-bonus-poker-download.html">double bonus poker download</a><a href="http://lowercased.org/wp-content/1/texas-holdem-poker.html">texas holdem poker</a><a href="http://lowercased.org/wp-content/1/euro-poker.html">euro poker</a><a href="http://lowercased.org/wp-content/1/download-games-poker-gratis.html">download games poker gratis</a><a href="http://lowercased.org/wp-content/1/play-poker-online.html">play poker online</a><a href="http://lowercased.org/wp-content/1/probabilidades-poker.html">probabilidades poker</a><a href="http://lowercased.org/wp-content/1/juegos-poker-texas.html">juegos poker texas</a><a href="http://lowercased.org/wp-content/1/internet-poker.html">internet poker</a><a href="http://lowercased.org/wp-content/1/game-poker.html">game poker</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/juego-instantaneo-online.html">juego instantaneo online</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/casino-virtual-gratis.html">casino virtual gratis</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/ganar-dinero-real-pagina-web.html">ganar dinero real pagina web</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/casino-on-net-com.html">casino on net com</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/video-poker-paginas-web.html">video poker paginas web</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/casino-roulette.html">casino roulette</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/descargar-juegos-pc.html">descargar juegos pc</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/ganancia-casino-portales-web.html">ganancia casino portales web</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/juegos-interactivos-internet.html">juegos interactivos internet</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/casinos-virtuales.html">casinos virtuales paginas web,casinos virtuales,casinos virtuales portal web</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/promociones-casino-portal-internet.html">promociones casino portal internet</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/premios-portales-internet.html">premios portales internet</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/premio-dinero-online.html">premio dinero online</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/juego-internet.html">juego internet</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/ruleta-americana-online.html">ruleta americana online</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/casino-virtual-web.html">casino virtual web</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/ruleta-de-la-suerte-descarga.html">ruleta de la suerte descarga</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/apuestas-libre-en-linea.html">apuestas libre en linea</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/juego-portal-web.html">juego portal web</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/jugar-seguro-portal-web.html">jugar seguro portal web</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/juegos-seguros-linea.html">juegos seguros linea</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/juego-gratis-portales-internet.html">juego gratis portales internet</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/casinos-descargas-internet.html">casinos descargas internet</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/ruleta-europea-portal-web.html">ruleta europea portal web</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/ruleta-de-la-suerte-online.html">ruleta de la suerte online</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/jugar-gratis-portal.html">jugar gratis portal</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/casinos-virtuales-online.html">casinos virtuales online</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/premio-dinero-paginas-internet.html">premio dinero paginas internet</a><a href="http://www.sandiegoconventionrentals.com/wp-content/1/jugar-keno-en-linea.html">jugar keno en linea</a></u> regarding our <a href="http://vivusarchitecture.com/archive/northfield-united-methodist-church-kitchen-dedication/">collaboration</a> with <a href="http://www.northfieldumc.org/">Northfield United Methodist Church</a>.</p>
<p>It was a pleasure to be of service.</p>
]]></content:encoded>
			<wfw:commentRss>http://vivusarchitecture.com/archive/letter-of-recommendation/feed/</wfw:commentRss>
		</item>
		<item>
		<title>We are IN.</title>
		<link>http://vivusarchitecture.com/archive/we-are-in/</link>
		<comments>http://vivusarchitecture.com/archive/we-are-in/#comments</comments>
		<pubDate>Thu, 06 Mar 2008 23:41:33 +0000</pubDate>
		<dc:creator>Peter Schmelzer</dc:creator>
		
		<category><![CDATA[All Entries]]></category>

		<category><![CDATA[Portfolio + Projects]]></category>

		<category><![CDATA[Project Diary 01]]></category>

		<guid isPermaLink="false">http://vivusarchitecture.com/archive/we-are-in/</guid>
		<description><![CDATA[
And so is our clawfoot tub.  More on that later&#8230;
With the help of family and friends, we made a major step toward moving into the house on Saturday.  Special thanks to Jeanne, Carol, Bill, Mary Ellen, Sam, John and Jeanne for their help first in cleaning the new house, then in moving most [...]]]></description>
			<content:encoded><![CDATA[<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-06-001.jpg' title='Tub in Place'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-06-001.jpg' alt='Tub in Place' /></a></p>
<p>And so is our clawfoot tub.  More on that later&#8230;</p>
<p>With the help of family and friends, we made a major step toward moving into the house on Saturday.  Special thanks to Jeanne, Carol, Bill, Mary Ellen, Sam, John and Jeanne for their help first in cleaning the new house, then in moving most of our stuff.  Mary and I slept in the sun porch on Friday night on an air mattress, then in our new Master Bedroom on Saturday.</p>
<p>It was wonderful.</p>
<p>A door on a room has rarely meant more!</p>
<p>Back to the tub, which was actually installed on Wednesday.  I like this picture because it makes the room look huge.  Actually, the room feels large but is tight; I couldn&#8217;t have taken 4&#8243; out of either dimension without dramatically impacting the sense of space.  As you will notice is the photos that follow, my camera lens can&#8217;t capture the space without backing through a window!</p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-06-002.jpg' title='Master Bathroom'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-06-002.jpg' alt='Master Bathroom' /></a></p>
<p>Here is another shot, showing the toilet modestly tucked away behind the shower.</p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-06-003.jpg' title='Master Medicine Cabinet'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-06-003.jpg' alt='Master Medicine Cabinet' /></a></p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-06-004.jpg' title='Vanity Cabinet'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-03-06-004.jpg' alt='Vanity Cabinet' /></a></p>
<p>The master bath was the last to be painted due to the tile installation.  The tile delayed the plumber, who delayed the painter, who delayed the electrician.  So, we&#8217;re almost done with the bathroom.  With luck, we may see the shower door and the electrician tomorrow.  The vanity top will have to wait another week, since it couldn&#8217;t be fabricated until the cabinet was set, which had to be coordinated with the tile.</p>
<p>Thanks (and apologies) to the workers who have worked around our stuff this week.  It is really great being home again, even with  a few interior details remaining.</p>
]]></content:encoded>
			<wfw:commentRss>http://vivusarchitecture.com/archive/we-are-in/feed/</wfw:commentRss>
		</item>
		<item>
		<title>The Surprise in the Closet</title>
		<link>http://vivusarchitecture.com/archive/the-surprise-in-the-closet/</link>
		<comments>http://vivusarchitecture.com/archive/the-surprise-in-the-closet/#comments</comments>
		<pubDate>Tue, 26 Feb 2008 16:40:17 +0000</pubDate>
		<dc:creator>Mary Schmelzer</dc:creator>
		
		<category><![CDATA[All Entries]]></category>

		<category><![CDATA[Portfolio + Projects]]></category>

		<category><![CDATA[Project Diary 01]]></category>

		<guid isPermaLink="false">http://vivusarchitecture.com/archive/the-surprise-in-the-closet/</guid>
		<description><![CDATA[
For a fun change, we had the inside of our daughter&#8217;s closet painted a crimson red.  The color is used elsewhere, so we didn&#8217;t have to order another custom paint mix.  She chose the room color of her previous bedroom (which is now an office) since she liked it so well.  The [...]]]></description>
			<content:encoded><![CDATA[<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-red-closet.jpg' title='The Surprise in the Closet'><img src='http://vivusarchitecture.com/wp-content/files/301plum-red-closet.jpg' alt='The Surprise in the Closet' /></a></p>
<p>For a fun change, we had the inside of our daughter&#8217;s closet painted a crimson red.  The color is used elsewhere, so we didn&#8217;t have to order another custom paint mix.  She chose the room color of her previous bedroom (which is now an office) since she liked it so well.  The closet is the perfect place to paint a fun, upbeat color that may become tiresome if it was a whole room.  The yellow of the walls and the crimson of the closet work well together.  </p>
<p>We chose to select our color palette right away instead of painting everything a neutral white and then painting again some other time.  It is far easier to have the painter come in with a sprayer and paint all walls and ceilings the same (this is typical for production housing) but we knew it would be years before we got back around to painting again.  </p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-orange-bedroom.jpg' title='“Grand Canyon” bedroom'><img src='http://vivusarchitecture.com/wp-content/files/301plum-orange-bedroom.jpg' alt='“Grand Canyon” bedroom' /></a></p>
<p>This is the bedroom across the hallway.  It has beautiful south and west daylight from two windows.  Part of the rationale for color choice was also the color of the trim work.  Mark Schad, our painter, has been doing a very careful job with painting all the trim and we wanted the wall colors to show off the trim to its best advantage.  Using pale colors may have been &#8220;safer&#8221; but as a color addict, various shades of white wasn&#8217;t going to work for me.  As you can see, the final coat isn&#8217;t on the walls yet&#8211;perhaps today.  One of the added benefits of this color is the way it pulls the color out of the wood floors.  Together they just glow.  (I&#8217;ll post a photo when the floors are unpapered and finished.)</p>
]]></content:encoded>
			<wfw:commentRss>http://vivusarchitecture.com/archive/the-surprise-in-the-closet/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Our First Doorknob</title>
		<link>http://vivusarchitecture.com/archive/our-first-doorknob/</link>
		<comments>http://vivusarchitecture.com/archive/our-first-doorknob/#comments</comments>
		<pubDate>Tue, 26 Feb 2008 14:49:59 +0000</pubDate>
		<dc:creator>Peter Schmelzer</dc:creator>
		
		<category><![CDATA[All Entries]]></category>

		<category><![CDATA[Portfolio + Projects]]></category>

		<category><![CDATA[Project Diary 01]]></category>

		<guid isPermaLink="false">http://vivusarchitecture.com/archive/our-first-doorknob/</guid>
		<description><![CDATA[Yesterday we saw the first door hardware installed on our new back door.  I didn&#8217;t have my camera, but you&#8217;ll get to see it soon.
One bedroom is now completely painted; all that remains in that room is the lights, receptacles, and a closet shelf.  
What still remains to be done inside or is [...]]]></description>
			<content:encoded><![CDATA[<p>Yesterday we saw the first door hardware installed on our new back door.  I didn&#8217;t have my camera, but you&#8217;ll get to see it soon.</p>
<p>One bedroom is now completely painted; all that remains in that room is the lights, receptacles, and a closet shelf.  </p>
<p>What still remains to be done inside or is underway:</p>
<li>Painting upstairs; there is quite a bit left to receive the finish coat.</li>
<li>Tile work in Master Bathroom shower</li>
<li>Door for the shower</li>
<li>Door hardware installation</li>
<li>Plumbing fixture installation</li>
<li>Light fixture, smoke alarm, and receptacle installation</li>
<li>One single door and one double door</li>
<li>Some minor trim and casing</li>
<li>Handrail installation</li>
<li>Final finish on hardwood floors</li>
<li>Carpet at hallway and stairs</li>
<li>Attic access panels</li>
<li>Attic pull-down stairs </li>
<li>Guardrail installation</li>
<p>The guys have been working hard to get things wrapped up, for which we are grateful. </p>
<p>I&#8217;ll remember my camera next time, honest.</p>
]]></content:encoded>
			<wfw:commentRss>http://vivusarchitecture.com/archive/our-first-doorknob/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Nearing Completion on Plum</title>
		<link>http://vivusarchitecture.com/archive/nearing-completion-on-plum/</link>
		<comments>http://vivusarchitecture.com/archive/nearing-completion-on-plum/#comments</comments>
		<pubDate>Sat, 23 Feb 2008 17:09:11 +0000</pubDate>
		<dc:creator>Peter Schmelzer</dc:creator>
		
		<category><![CDATA[All Entries]]></category>

		<category><![CDATA[Portfolio + Projects]]></category>

		<category><![CDATA[Project Diary 01]]></category>

		<guid isPermaLink="false">http://vivusarchitecture.com/archive/nearing-completion-on-plum/</guid>
		<description><![CDATA[
This week, Mary and I stopped at Welding Resources to check on the progress of the new guardrail.  Dean Odette really stepped up in short order and pulled the guardrail together; we made a last minute design change from a traditional cherry newel and rail to this stainless steel guardrail.  Why? It allows [...]]]></description>
			<content:encoded><![CDATA[<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-21-017-rail.jpg' title='Guardrail looking good at the metal shop'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-21-017-rail.jpg' alt='Guardrail looking good at the metal shop' /></a></p>
<p>This week, Mary and I stopped at Welding Resources to check on the progress of the new guardrail.  Dean Odette really stepped up in short order and pulled the guardrail together; we made a last minute design change from a traditional cherry newel and rail to this stainless steel guardrail.  Why? It allows us to save the original newel and save about $1,500 in the process.  It was exciting to see the rail looking so good; Dean agreed.</p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-21-016-stair.jpg' title='Stairway ready to receive guardrail'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-21-016-stair.jpg' alt='Stairway ready to receive guardrail' /></a></p>
<p>Here is where the guardrail will be installed: between the newel post and the doorway in the background.  The guardrail will be lag screwed to the newel post and the studs directly behind the door trim.  The slenderness of the steel will work well in this application; we&#8217;re looking forward to seeing the contrast of the turned newel against the sleek steel.</p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-21-003-closet.jpg' title='Master Closets awaiting paint'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-21-003-closet.jpg' alt='Master Closets awaiting paint' /></a></p>
<p>These cabinets are the closets and dressers for the Master bedroom.  We opted for built-ins instead of closets to optimize the space.  The floor plan is very efficient, leaving no room for a walk-in closet.  &#8220;Shoe-horned&#8221; would be an accurate description of how we worked four bedrooms and two bathrooms into the floorplan, but wouldn&#8217;t be an accurate way to describe the spaces themselves.  They are appropriately sized and functional, and seem to flow well.</p>
<p>So, back to the title of this post: nearing completion.  We&#8217;ve decided not to try to move into the house tomorrow due to the work remaining (although not without some angst.)  The final coat of paint remains to be applied to all of the bedrooms.  The hardwood floors still need a final finish coat.  The tilework in the bathrooms is incomplete, so the fixtures are not yet set.  The light fixtures are still in boxes as are the door hardware sets.  Three doors are still on order, which still need finishing and installation.  Today they are finishing the last of the window trim and sanding the patches on the drywall.  The new boiler and air handlers are not ready to go.  The water is yet to be connected, since the fixtures are not installed.</p>
<p>Outside, there has not been much progress, since the guys were pushing hard on the interior.  Corner boards, water table and siding will be installed.  We&#8217;ll paint in the spring when it gets warm enough.  We also plan to insulate the exterior of the foundation, which can&#8217;t happen until the ground thaws.  And we&#8217;ll need to do some dirtwork and landscaping.</p>
<p>Causes for the delay?  The airkrete insulation switch cost us a few days, then the icynene truck wouldn&#8217;t start in the cold, costing another day.  We ended up putting new ceilings in two rooms downstairs due to inadvertent damage during construction, which forced us to paint both walls and ceilings.  The drywall contractor&#8217;s work left much to be desired, so our painter has spent extra time patching and sanding the blemishes.  </p>
<p>So what of the delay?  We have a contract for completion by tomorrow, so there will be some negotiation about how to handle the missed date and the additional costs and inconvenience it means for us.  That&#8217;s the long and the short of it.</p>
<p>Of course, we are more than ready to move back into our home.  The adventure of living in &#8220;the cabin&#8221; has worn off completely.  The cold weather has not helped at all, keeping us indoors for the most part.  I am impressed with how mentally challenging this process has become as both the designer and displaced owner, on myself and on our family.</p>
<p>The sun is out today and the temperatures are up!  We are pitching in with the painting the walls (easy stuff) so our painter can focus on the cabinets, doors and trim (tougher).  Our new goal is to sleep in the bedrooms next Friday night.  I&#8217;m going to patch the newel today, sand it and prime it.  We may be able to install the guardrail on Monday if its finish is properly cured.</p>
<p>Oh, we stopped in to see the carpet yesterday.  Vos Floors in Faribault received and unrolled it for our inspection.  I looks great.  We&#8217;ve chosen wool carpet for it&#8217;s durability, sustainability, and nice appearance.  It will be installed in the hallway and on the stairs after the final coat goes down on the hardwood floors.</p>
]]></content:encoded>
			<wfw:commentRss>http://vivusarchitecture.com/archive/nearing-completion-on-plum/feed/</wfw:commentRss>
		</item>
		<item>
		<title>T-7 days and counting at Plum Street</title>
		<link>http://vivusarchitecture.com/archive/t-7-days-and-counting-at-plum-street/</link>
		<comments>http://vivusarchitecture.com/archive/t-7-days-and-counting-at-plum-street/#comments</comments>
		<pubDate>Mon, 18 Feb 2008 16:06:49 +0000</pubDate>
		<dc:creator>Peter Schmelzer</dc:creator>
		
		<category><![CDATA[All Entries]]></category>

		<category><![CDATA[Portfolio + Projects]]></category>

		<category><![CDATA[Project Diary 01]]></category>

		<guid isPermaLink="false">http://vivusarchitecture.com/archive/t-7-days-and-counting-at-plum-street/</guid>
		<description><![CDATA[
It is amazing how much can get done in a week, but it looks to me like the remaining work on Plum Street won&#8217;t all be done by 24 February, the day our contract says the work will be substantially complete (when we can again occupy the house.)  I have been proven wrong in [...]]]></description>
			<content:encoded><![CDATA[<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-16-005-tile.jpg' title='Tile closeup'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-16-005-tile.jpg' alt='Tile closeup' /></a></p>
<p>It is amazing how much can get done in a week, but it looks to me like the remaining work on Plum Street won&#8217;t all be done by 24 February, the day our contract says the work will be substantially complete (when we can again occupy the house.)  I have been proven wrong in the past, though, and hope for it to happen again.  Much has happened since our last post!</p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-13-004-tubes.jpg' title='Tubes in the concrete'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-13-004-tubes.jpg' alt='Tubes in the concrete' /></a></p>
<p>Last Thursday, the Mudroom floor received sand, insulation and tubes for radiant floor heat.  The copper tube encloses the temperature sensor for the thermostat.</p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-14-015-conc.jpg' title='Valentine’s Day Slab'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-14-015-conc.jpg' alt='Valentine’s Day Slab' /></a></p>
<p>Then, like the true romantic that I am, I bought my wife wet concrete for Valentine&#8217;s Day. </p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-16-004-tile2.jpg' title='Window trim'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-16-004-tile2.jpg' alt='Window trim' /></a></p>
<p>Floor and wall tile installation began, too.  Since this photo was taken, the vanity was set in place so we can get the countertop made and installed.</p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-16-001-trim.jpg' title='Window Trim'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-16-001-trim.jpg' alt='Window Trim' /></a></p>
<p>I believe the most visually rewarding development was the installation of window trim.  This award may be usurped by the installation of baseboards, which started this morning as the last of the windows and doors are being trimmed.  It looks great.</p>
<p>We added a smidge of sweat equity to the project this weekend: sweeping, cleaning and a bit of re-painting where touch-up was needed.  Thanks to Robert and Julia who came to visit and help!  Actually, we have been sweeping and picking up around the project all along to help minimize costs.  We can do this work after the contractors finish each day; that way we stay out of their way and allow them to be most productive while on site.  Personally, I find it a great way to stay in touch with the project and spend time thinking about how things are coming together (besides getting some quiet alone time!)</p>
]]></content:encoded>
			<wfw:commentRss>http://vivusarchitecture.com/archive/t-7-days-and-counting-at-plum-street/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Finishes and Details spruce up Plum Street</title>
		<link>http://vivusarchitecture.com/archive/finishes-and-details-spruce-up-plum-street/</link>
		<comments>http://vivusarchitecture.com/archive/finishes-and-details-spruce-up-plum-street/#comments</comments>
		<pubDate>Sun, 10 Feb 2008 18:34:58 +0000</pubDate>
		<dc:creator>Peter Schmelzer</dc:creator>
		
		<category><![CDATA[All Entries]]></category>

		<category><![CDATA[Portfolio + Projects]]></category>

		<category><![CDATA[Project Diary 01]]></category>

		<guid isPermaLink="false">http://vivusarchitecture.com/archive/finishes-and-details-spruce-up-plum-street/</guid>
		<description><![CDATA[
The first week of February was a bustle of activity at Plum Street North.
Installation of exterior trim and entry canopies began.  With them, the scale of the house is becoming more humane.  The siding will help in this regard also.


Many items came to the jobsite pre-assembled and pre-painted.  This helps control quality, [...]]]></description>
			<content:encoded><![CDATA[<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-07-023.jpg' title='Front entry canopy'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-07-023.jpg' alt='Front entry canopy' /></a></p>
<p>The first week of February was a bustle of activity at Plum Street North.</p>
<p>Installation of exterior trim and entry canopies began.  With them, the scale of the house is becoming more humane.  The siding will help in this regard also.</p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-07-005.jpg' title='Canopy Caravan'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-07-005.jpg' alt='Canopy Caravan' /></a></p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-07-008.jpg' title='Prefab Window Trim'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-07-008.jpg' alt='Prefab Window Trim' /></a></p>
<p>Many items came to the jobsite pre-assembled and pre-painted.  This helps control quality, minimize jobsite waste, and contend with cold weather.  It also quickly transforms the exterior of the project into a house!</p>
<p><a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-07-001.jpg' title='Floors, Floors, Floors'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-07-001.jpg' alt='Floors, Floors, Floors' /></a>    <a href='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-07-002.jpg' title='More Floors'><img src='http://vivusarchitecture.com/wp-content/files/301plum-2008-02-07-002.jpg' alt='More Floors' /></a>  </p>
<p>The hardwood floors were installed and the painter started his work, priming all the new rooms and getting color on the kids&#8217; bedrooms and baths.  This morning we braved the sub-zero weather and checked out the floors.  Caesar has a fresh coat of finish on them; it was great to see the depth of the wood shining in the sun!</p>
<p>Finished interior trim was delivered yesterday and awaits installation in a pile on the porch floor.</p>
<p>I noticed that the house is much tighter already than it was before.  The new windows, the air infiltration barrier, and the icynene insulation make the house warm and quiet.  The old furnace in the basement has no trouble keeping the house at 60 degrees, even though it is no longer connected to any ductwork.  The cracked heat exchanger may be releasing combustion fumes into the interior air, which is a concern, except that we&#8217;ve seen open windows and attic hatches for fresh air.  Once the drywall and floors are all sanded, we can switch to the new heating system and the energy recovery ventilator.</p>
]]></content:encoded>
			<wfw:commentRss>http://vivusarchitecture.com/archive/finishes-and-details-spruce-up-plum-street/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Fremont Circle Interior</title>
		<link>http://vivusarchitecture.com/archive/fremont-circle-interior/</link>
		<comments>http://vivusarchitecture.com/archive/fremont-circle-interior/#comments</comments>
		<pubDate>Sun, 10 Feb 2008 18:11:29 +0000</pubDate>
		<dc:creator>Peter Schmelzer</dc:creator>
		
		<category><![CDATA[All Entries]]></category>

		<category><![CDATA[Portfolio + Projects]]></category>

		<guid isPermaLink="false">http://vivusarchitecture.com/archive/fremont-circle-interior/</guid>
		<description><![CDATA[
Behind the translucent veil of the dust barrier, the drywall has been installed on Fremont Circle.  
The combination of a low ceiling and tall windows create an airy, connected-to-the-outdoors feeling.  This will change a bit as custom window blinds and art glass are installed in the weeks to come&#8230;
]]></description>
			<content:encoded><![CDATA[<p><a href='http://vivusarchitecture.com/wp-content/files/vansk0701-2008-01-30-001.jpg' title='Light and Airy interior'><img src='http://vivusarchitecture.com/wp-content/files/vansk0701-2008-01-30-001.jpg' alt='Light and Airy interior' /></a></p>
<p>Behind the translucent veil of the dust barrier, the drywall has been installed on Fremont Circle.  </p>
<p>The combination of a low ceiling and tall windows create an airy, connected-to-the-outdoors feeling.  This will change a bit as custom window blinds and art glass are installed in the weeks to come&#8230;</p>
]]></content:encoded>
			<wfw:commentRss>http://vivusarchitecture.com/archive/fremont-circle-interior/feed/</wfw:commentRss>
		</item>
	</channel>
</rss>
