Windows went in before Christmas
January 10th, 2008 by Peter SchmelzerHere’s a little rewind: pictures from my phone. On 21 December, this was the state of things. Gary and Matt started installing the second floor windows. The rough framing inside was done, but plumbing and electrical would wait for the windows.
By the end of the day, the second floor windows and the mudroom and sunporch windows were installed. These were exciting times, since the windows meant enclosure.
While this was going on, work was also happening in the shop. While we haven’t seen them on site, front and back entry canopies are being fabricated and the window trim is being assembled and painted.