Our First Doorknob

February 26th, 2008 by Peter Schmelzer

Yesterday we saw the first door hardware installed on our new back door. I didn’t have my camera, but you’ll get to see it soon.

One bedroom is now completely painted; all that remains in that room is the lights, receptacles, and a closet shelf.

What still remains to be done inside or is underway:

  • Painting upstairs; there is quite a bit left to receive the finish coat.
  • Tile work in Master Bathroom shower
  • Door for the shower
  • Door hardware installation
  • Plumbing fixture installation
  • Light fixture, smoke alarm, and receptacle installation
  • One single door and one double door
  • Some minor trim and casing
  • Handrail installation
  • Final finish on hardwood floors
  • Carpet at hallway and stairs
  • Attic access panels
  • Attic pull-down stairs
  • Guardrail installation
  • The guys have been working hard to get things wrapped up, for which we are grateful.

    I’ll remember my camera next time, honest.