Yesterday we saw the first door hardware installed on our new back door. I didn’t have my camera, but you’ll get to see it soon.
One bedroom is now completely painted; all that remains in that room is the lights, receptacles, and a closet shelf.
What still remains to be done inside or is underway:
Painting upstairs; there is quite a bit left to receive the finish coat.
Tile work in Master Bathroom shower
Door for the shower
Door hardware installation
Plumbing fixture installation
Light fixture, smoke alarm, and receptacle installation
One single door and one double door
Some minor trim and casing
Handrail installation
Final finish on hardwood floors
Carpet at hallway and stairs
Attic access panels
Attic pull-down stairs
Guardrail installation
The guys have been working hard to get things wrapped up, for which we are grateful.